Commercial general contractor · Dallas-Fort Worth

Everything measures from here.

You are not looking for a pitch. You are qualifying a builder. So the things you actually check are published on this site: bonding capacity, safety record, schedule history, and the ledger of what we have built. Start wherever your checklist starts.

The finished Cedar Ridge Medical Pavilion in late afternoon light, three stories of limestone and metal panel with a projecting entry canopy
N 33°09'02" Cedar Ridge Medical Pavilion · Frisco TX
$150M
Aggregate bonding capacity
0.71
EMR, 2026 · lower is better
94%
Delivered on or ahead of schedule, all 214 projects
71%
Of 2025 revenue came from repeat owners

STA 01 The critical path

One building, told as its schedule.

Cedar Ridge Medical Pavilion · Frisco TX · 64,000 SF · CM at Risk · $28.4M · delivered 9 days early

01 / 06 NOV 2023 - MAR 2024

Preconstruction

GMP assembled while the architect was still drawing; every overhead system clash-resolved in the model before notice to proceed. The building was finished on a screen before it started in the dirt.

GMP to final cost delta: 1.8%

Three people around a plan table reviewing a floor plan, a building model on the screen behind them

STA 03 How you buy a building

The delivery method is the biggest decision you make before we ever meet.

CM at Risk, design-build, or competitive bid. Each one is right for a different owner in a different situation, and we will tell you when it is not ours to win. The advisor asks five questions and shows you its math.

STA 04 To the trades

Hablamos español. Not as a courtesy. As how the work gets built.

Half the people who build our projects run their business in Spanish, so this entire site runs in Spanish, and so do our safety orientations, our toolbox talks, and our prequal paperwork. Bid day should never turn on a translation.

  • Paid within 10 business days of the owner paying us. In writing.
  • Retainage released by trade at trade completion, not at project close.
  • The bid board is public: every open invitation, plans included.
  • Orientation every Monday, 6:30 AM in English, 7:15 AM en español.

STA 05 The number that outranks the price

Our EMR has fallen every year since 2021. We publish the chart.

An experience modification rate is the one safety number an owner can verify, because the rating bureau computes it, not a marketing department. Ours is 0.71. The full history, our TRIR, and how we run the work are on the safety page.

1.00 = INDUSTRY AVERAGE 202120222023202420252026 0.980.71

EMR by policy yearLower is better · verified by our carrier

STA 06 Who you actually hire

Two ironworkers on structural steel at dusk, one welding, sparks falling through the frame
ON THE STEEL Ironworkers on a Datum frame. Our supers are on site before the trailer.

You do not hire a logo for 14 months. You hire a superintendent.

So we put ours on the website, with their years, their projects, and the phone that rings in the trailer. The person who runs your job is someone you met before you signed.

DATUM

COMMERCIAL CONSTRUCTION

A datum is the one mark on a drawing set that every other measurement answers to. We named the company after the obligation, and the apex of that mark is where this one is set.

▽ EL. 0'-0" · SET YOUR BENCHMARK

Put us on the bid list. Then hold us to all of this.