The ledger · 2021-2025
Named projects. Real values. Credited architects.
A portfolio you cannot verify is marketing. This one is a ledger: every entry names the building, the city, the contract value, the delivery method, how the schedule ended, and the architect we built it with. Filter it the way you would read it.
STA 01 Filter the ledger
Eighteen entries from the last five years.
Showing 18 projects · $360.7M combined contract value
-
The homepage tells this one as its schedule. Medical office and ambulatory surgery over structured parking, GMP held within 1.8% of final cost, delivered 9 days ahead of contract substantial completion with zero lost-time incidents.
DeliveryCM at RiskSchedule outcome9 days earlyArchitectAranda Fielder ArchitectsCompleted2025 -
A bond-program CTE center with automotive bays, culinary labs, and a broadcast studio. Sequenced so every lab building inspection closed before summer break ended. Opened on the first day of the school year it was promised for.
DeliveryCM at RiskSchedule outcomeOn timeArchitectMerrick StudioCompleted2024 -
Cross-dock distribution with 190 trailer stalls. Our crews self-performed 61 tilt panels, which is why the panel schedule never left our control. Delivered 14 days early; the tenant's racking crews started while our punch walk was still warm.
DeliveryDesign-BuildSchedule outcome14 days earlyArchitectCalder + VossCompleted2025 -
Nine floors of speculative office over two of parking, our largest vertical build to date. Curtain wall procured 11 months ahead of need during the 2022 glass shortage; that one purchase order protected the whole top-out sequence. 6 days early.
DeliveryCM at RiskSchedule outcome6 days earlyArchitectAranda Fielder ArchitectsCompleted2023 -
Hard-bid public work, won on price and held on discipline: courtrooms, detention-adjacent circulation, and security electronics commissioned against a county acceptance protocol. Zero change orders initiated by the contractor.
DeliveryCompetitive bidSchedule outcomeOn timeArchitectLantana ArchitectureCompleted2024 -
Gym, commercial kitchen, and classrooms for a congregation that met in the existing sanctuary through the whole build. Monthly open-book reviews with the building committee; the final GMP reconciliation returned $214,000 in unspent contingency.
DeliveryCM at RiskSchedule outcome4 days earlyArchitectMerrick StudioCompleted2023 -
Four ORs and recovery under a single design-build contract. Medical gas, isolation power, and air balance all pre-inspected against state licensure checklists, so licensing survey passed on the first visit and the surgery group opened on its advertised date.
DeliveryDesign-BuildSchedule outcomeOn timeArchitectStudio CardenaCompleted2024 -
Three flex-shell buildings delivered in a rolling sequence so leasing could start on Building A while C was still in panels. 8 days early on the final certificate, and the developer signed its first tenant before we demobilized.
DeliveryDesign-BuildSchedule outcome8 days earlyArchitectCalder + VossCompleted2023 -
Twelve classrooms and a cafeteria expansion built in one summer window on an occupied campus. The demolition permit and the first pier both landed the day after the last school bell, because the whole preconstruction effort aimed at exactly that morning.
DeliveryCompetitive bidSchedule outcomeOccupied by first bellArchitectLantana ArchitectureCompleted2025 -
Full-floor corporate interiors in an occupied high-rise: after-hours demolition, freight elevator scheduling negotiated with building management, and a move-in weekend that ended with employees at desks Monday 8 AM.
DeliveryCM at RiskSchedule outcomeOn timeArchitectStudio CardenaCompleted2025 -
Three apparatus bays, dorms, and a training mezzanine. The alerting system, bay doors, and diesel exhaust capture were commissioned with the crews who would run them, and the station answered its first call the week we handed over keys.
DeliveryCompetitive bidSchedule outcomeOn timeArchitectLantana ArchitectureCompleted2022 -
Outpatient behavioral health with ligature-resistant detailing throughout. Every fixture, hinge, and ceiling type was mocked up and signed off by the clinical team before procurement, because a correction after drywall costs ten times the mockup.
DeliveryCM at RiskSchedule outcomeOn timeArchitectAranda Fielder ArchitectsCompleted2022 -
An 800-seat auditorium, band hall, and black box on a live campus. Acoustic isolation joints do not forgive improvisation, so the rigging, catwalks, and house audio were coordinated in the model to the bolt. 5 days early, and the fall musical opened on it.
DeliveryCM at RiskSchedule outcome5 days earlyArchitectMerrick StudioCompleted2023 -
A minus-10-degree freezer addition tied into a running cold chain. The tie-in was executed over one 54-hour weekend shutdown, rehearsed twice on paper, and the owner's product never left temperature.
DeliveryCompetitive bidSchedule outcomeOn timeArchitectCalder + VossCompleted2024 -
Lobby, curtain wall skirt, and amenity floor rebuilt around tenants who never moved out. Weekend crane picks, negative-air corridors, and a tenant newsletter our PM wrote herself every Friday. Zero tenant business days lost.
DeliveryCM at RiskSchedule outcomeZero tenant days lostArchitectStudio CardenaCompleted2024 -
A 1,200-seat sanctuary with a 68-foot glulam ridge. Design-build let the structure and the audiovisual package be engineered together instead of sequentially, and the room was ready three days before its first Easter.
DeliveryDesign-BuildSchedule outcome3 days earlyArchitectMerrick StudioCompleted2025 -
A civic living room: reading terraces, a makerspace, and a children's wing under a folded roof that took 40 pages of steel shop drawings to earn. Built through the 2021 supply shocks without surrendering the opening date.
DeliveryCM at RiskSchedule outcomeOn timeArchitectLantana ArchitectureCompleted2021 -
Precision manufacturing with 30-ton crane rails, epoxy floors flat to FF50, and process utilities that had to be live before the owner's equipment vendors would ship. 12 days early, which mattered because the equipment was already on the water.
DeliveryCM at RiskSchedule outcome12 days earlyArchitectCalder + VossCompleted2022
References for any entry above are available inside the prequalification packet: owner contact, architect contact, and the final schedule. Request the packet.